High precision cylinder
finisher for concrete slabs such as Streets, Parking, Factory
floors, Bridges, Airports, Tennis Courts, Canal, Reservoir etc.
It can finish a width from 3.5 mts. to
20 mts.
Machine can
finish up to 150 Mts. sq/hour
Light weight construction
for easy erection and transportation from site to site
The special Under carriage
consists of a spreader augar to spread the concrete to level, The
finishing Cylinder to compact and finish the concrete to the grade
Finishing roll bracket can
be equipped with vibrator
Machine can be used
alternatively for bed and slope finishing canal projects.
Special arrangement is made
for PVC INSERTER, which can inserter longitudinally as well as
vertically, and also Groove Cutter arrangement is made, which ever
you may require
Under Carriage accommodates the most critical components of the machine. It encompasses the vibratory finishing drum, Needle vibrators, Spreader Auger, Drag pan and Texturing Mat.
The Under Carriage travels with a speed 30 mtrs/min.
The finishing drum is 4 feet in length and 10.7 inches (272 mm) in diameter. It rotates at a speed of 195 rpm. The finishing drum vibrates at 1500vpm.This Drum is precisely balance with the help of computerized balancing system to obtain quality finish.
All-welded steel, pin-connected mainframe. The frames are available in the lengths of 4feet; 8feet and 12feet.These are bolted together according to the size of the slab width. For working widths beyond 10mtrs over truss assembly is used.
Step
1:
Leveling and compaction of the sub-grade. Step 2:
Erection of the machine. Step 3:
Level of the 50lbs rails with the help of rail setting bolts. Step 4:
After completing the erection the pitch rail on which the
undercarriage slides is thoroughly leveled with the help leveling
screws provided within the frame. Step 5:
According to the slab height, the finishing drum is leveled
with the help of four mechanical jacks. Step 6:
The side panels are erected according to the dimensions specified
for the concrete slab. Step 7:
The machine is now ready for paving.
After pouring the concrete on sub-grade the machine will move in the forward direction and the Undercarriage moves to and fro in a transverse direction.
The Undercarriage completes one cycle when it travels the entire width of the slab to and fro.
Spreader augers are used to spread the excess material, which comes in the way of finishing drum.
The first pass of the cycle is the compaction pass while the second pass is called the finishing pass.
After Undercarriage completes one cycle the machine moves in the forward direction.